This study's §7.4 ended on a finding about absence: the engineering numbers that decide whether orbital data centres can work were not in the record the FCC is deciding on. In the two months since we published, that record has moved a great deal — the Commission wrote to all four applicants, rewrote the rulebook the study calls an accelerant, and received answers from every one of them.
And a second record opened. One of those four applicants went public four and a half weeks before we published, which means it now files with a different regulator, under a different kind of liability, for a different audience. The two records describe the same satellites in the same months. They do not contain the same things. What follows is what happened in the sky, then the record the Commission is deciding on, then the other one — because the gap between those two is, in the end, the study's own argument arriving as documented fact.
The study's most-quoted number moved — in the direction the study warned about. At publication the latest filed count was 148,696 collision-avoidance maneuvers by the Starlink fleet over June–November 2025: roughly 800 a day. SpaceX's next semiannual report to the FCC (dated 1 July 2026, covering December 2025–May 2026) reports 207,152 — about 1,140 a day, one every 1.3 minutes — and with it more than 355,000 dodges in the trailing year — more than three times the ≈100,700 reported across the two periods spanning December 2023–November 2024 SOURCED (SpaceX FCC semiannuals) daily rate and multiples DERIVED. One caution we carried at publication now points the other way: last year the per-satellite rate was falling while the fleet grew — a growing denominator, not a falling burden. This period both rose: the fleet grew and the fleet now averages more than 40 dodges per satellite per year (Gen1 ≈36, Gen2 ≈46, by the report's own figures) fleet-wide average DERIVED. The safety workload is outrunning the fleet's own growth. The same report records 260 satellites brought down under control in six months, at a disposal reliability SpaceX puts above 99% — the exit side of the ledger is real; it is the avoidance side that is compounding. ESA's 2026 environment report, in its own words, sees the same shape: its yearly analysis since 2015 shows, "particularly in the lower LEOIADC regime" — the lower part of the IADC-defined protected region — a rising number of close approaches that require coordination between active operators SOURCED (ESA SER 10.0, p. 80 printed; PDF p. 107). Worth noting who is worried: Hugh Lewis of the University of Birmingham — co-author of the runaway-threshold assessment this study cites (Lewis & Kessler 2025) — now describes a collision involving an operational constellation satellite as the direction of travel, while noting each individual dodge cuts that pass's odds to roughly one in a million. Both halves are the study's §5 in one sentence: the record is clean because the dodging is relentless — and nothing requires it to continue.
The clock ticked. The CRASH Clock — the expected wait to a possible collision among tracked objects if every maneuver stopped — read 164 days in 2018, 5.5 in mid-2025, and 2.5 when we published. On 15 August 2026 it moved to 2.2 days SOURCED (Outer Space Institute). The full series is now 164 → 119 → 102 → 62 → 26 → 11 → 6.8 → 6.8 → 5.5 (June 2025) → 3.8 (January 2026) → 3 (March) → 2.5 (May) → 2.2 (15 August). Read it the way the study reads it: not a forecast, a measure of how much of the calm is being manufactured by hand, every day.
A stage came apart inside the study's bands. On 27 August 2026, two days after delivering a seven-satellite rideshare, a Chinese Long March 6C upper stage fragmented in a 396 × 482 km orbit; LeoLabs counted tens to hundreds of pieces SOURCED (LeoLabs via SpaceNews). That altitude range spans the study's crewed band and reaches the internet corridor. Three things the study's framing says about it: it was an explosion, not a collision — the zero-collision record the study's §5 rests on is untouched; at that altitude the air is thick enough that the debris is expected to be gone within a few years — the self-cleaning floor working as described; and it is exactly the kind of event the corridor's daily dodging is built to absorb — more objects to dodge, for a while, in the band where the dodging is already densest. What it is not: a cascade, a trigger, or a forecast.
The removal frontier moved — backward. ADRAS-J, the mission that set the demonstrated frontier our avenues table cites (a 15-metre inspection approach, no capture), has completed operations and begun its own deorbit — the servicer descends; the debris stays. The first actual capture attempts have receded: ADRAS-J2 to Japan's fiscal 2027; ClearSpace-1, once booked for late 2026, is now planned for 2029 with a new target SOURCED (ESA). The count of derelicts ever removed by a third party remains zero.
Also in this period: the FCC approved (9 July) the launch of Reflect Orbital's Eärendil-1 sunlight reflector, first of a proposed 50,000-mirror constellation; still unflown as of 22 September 2026.
The record that decides
The FCC asked every orbital-data-center applicant the study's question. On 28 August the FCC's Space Bureau wrote to all four companies seeking to put data centers in orbit — SpaceX (up to one million satellites), Blue Origin (51,600), Starcloud (up to 88,000) and Orbital Compute (up to 100,000) — and told each the same thing: its application "is missing certain orbital debris mitigation information" the Commission's rules require SOURCED (Space Bureau letters, ICFS PC0116698 / PC0116705 / PC0116696 / PC0116697). Each letter asks for the satellite's physical dimensions, a demonstration that its lifetime probability of colliding with a large object stays under 1 in 1,000, a casualty-risk demonstration, whether reentry will be targeted or uncontrolled — and, in the regulator's words, how the applicant will "ensure that other operators are able to successfully operate" in the shells it wants. A footnote reminds each that failing to respond can end in dismissal. The deadline, first 11 September, was extended to the 18th; all four have answered SOURCED (responses, ICFS PC0117233 / PC0117285 / PC0117235 / PC0117133). The answers, in the applicants' own words:
- SpaceX — which now calls the system Starmind — says it will share orbits and maneuver plans, but that "SpaceX cannot ensure that other operators are able to successfully operate in these orbits," because it does not control their satellites. It files, for the first time, enveloping dimensions: solar arrays under 1,500 m², radiators under 200 m², mass under 4,000 kg; reentry targeted at the ocean; per-satellite collision probability under the limit for the four shells it lists (550–585 km).
- Blue Origin cannot yet give dimensions — its "design is maturing" — and answers the collision question by citation: because its satellites can maneuver, under the Commission's rule "the collision risk is assumed to be zero." Reentry "will be uncontrolled," and the end-of-life deorbit phase runs from six months to four years depending on altitude and where the solar cycle sits — a decay duration, not a commitment to clear the orbit in that time.
- Starcloud describes a spacecraft about 6 × 220 m, disposed of by "uncontrolled atmospheric reentry" after lowering itself below 390 km.
- Orbital Compute restates the figures the study's heat-wall uses — about 100 m² of radiator, 260 m² of solar array, some 2,000 kg — plans targeted reentry, and asks until 10 December to file its collision and casualty demonstrations. Its own failure case: a dead satellite at 825 km stays up 15–20 years.
Read these the way the study reads the rules. Every question the Bureau asked is a per-satellite question, and every answer is a per-satellite answer: one spacecraft, under 1 in 1,000. Nothing in the exchange asks what a million of them add up to — that arithmetic has been done in public only by NASA (below). And SpaceX's sentence is not our gloss on the filing — it is the regulator's own question declined on the record. The Bureau asked how SpaceX would "ensure that other operators are able to successfully operate" in those orbits; SpaceX answered that it "cannot ensure" it, "because it does not control their satellites." That is the study's §5 in two sentences of a docket: the occupant of a shell coordinates with whoever shows up, and nobody — the occupant least of all — can guarantee the shell stays usable for everyone else.
The deployment clock was rewritten — five days before we published, and we missed it. On 22 July the FCC adopted its Space Modernization order, replacing the satellite-licensing rulebook (Part 25) with a new one (Part 100) SOURCED (FCC 26-47, adopted 22 Jul 2026). The study's §4 describes the old rulebook's deploy-or-forfeit machinery — half the system in six years, all of it in nine, a bond forfeited on a miss — as an accelerant. That description remains accurate for the rules in force today: Part 100 takes effect on a date the Space Bureau has yet to announce, and pending applications are judged under whatever rules are in place when the FCC acts (¶¶ 320, 332). But the direction is set. The bond will apply only to systems that choose to enter a spectrum "processing round" — and since entering is voluntary, the order says, "the bond is also optional" (¶ 250). The FCC had proposed keeping the bond for any system of 200 or more satellites; it declined its own threshold. Systems outside processing rounds get a slower clock: one satellite within seven years, 10% within nine, half within twelve, all within fourteen (¶ 227). All four data-center applicants have asked to be treated outside processing rounds. The accelerant is being eased — for reasons of spectrum policy and licensing speed. And the bond it eases was never pointed at the other failure in the first place: across 312 pages the order discusses disposal, deorbiting and debris at length, and bonds 228 separate times, and the two subjects never once come within a few sentences of each other DERIVED (ours; full-text search of FCC 26-47). The words "financial assurance" and "remediation" do not appear in it at all. The surety bond is a deployment instrument end to end, and the order creates no financial-assurance mechanism for disposal or remediation anywhere in it.
The filers had already asked to shed the clock — and NASA had objected. Before the order, the newest entrants were asking for the same relief one licence at a time. Blue Origin's Project Sunrise application — accepted for filing 17 April — asks the Commission to waive the milestone schedule and the surety bond, among four requested waivers SOURCED (the application, Narrative §IV.D; FCC Public Notice SAT-01992). Its argument, in its own words, is that the bond's "original aim" was to prevent spectrum warehousing, and that it seeks no priority use of spectrum — so the bond's purpose does not reach it; it leaned on the FCC's October 2025 proposal SOURCED (FCC 25-69, ¶¶ 175–177), which the July order has now carried further than proposed. The request is the study's §4 diagnosis visible in the docket: the clock is the expensive part, and filers know it. NASA's objection is on the docket: a 30 April letter from its Space Operations Mission Directorate, citing "the absence of an orbital debris mitigation plan" SOURCED (NASA, ICFS comment PC0114787). It is one of four — the others on the SpaceX, Starcloud and, on 3 September, Orbital Compute applications. They share a template, and the opening sentence is the same each time with the numbers swapped: a proposed deployment of this many satellites across these shells "raises considerations for the safety and long‑term sustainability of NASA operations" — 51,600 satellites from 500 to 1,800 km in the Blue Origin letter, 100,000 from 500 to 850 km in the Orbital Compute one SOURCED (NASA, ICFS comments PC0114787, PC0116809). That is worth noticing in itself: the agency has a standing formula for this situation now, and it is reaching for it once a filing. Its SpaceX letter opens on the same machinery: SpaceX, too, asked to waive the deployment milestones and the bond for the million-satellite system SOURCED (SpaceX, Waiver Requests §2), and NASA objects that without them "NASA cannot accurately assess collision risks" SOURCED (NASA, ICFS comment PC0110423). Hold both readings at once: the deploy-or-forfeit clock the study calls an accelerant is also, in NASA's reading, the only schedule anyone else in orbit can plan around. That letter then does something no regulator has done in public: it takes SpaceX's own filed parameters at face value and works them through at a million spacecraft — a disposal-orbit collision probability that becomes "up to 100 collisions per year"; a 99.9% disposal reliability that still strands "1,000 or more spacecraft" in their operating shells; a casualty-risk threshold that across a million reentries "can lead to an expectation of casualty of 100" — and asks for full demise on reentry. Those are NASA's arithmetic on the applicant's numbers, not the study's; they are quoted here because they are exactly the scale-conditional reading the study argues the record should force, arriving from the agency whose crew fly through the band. No ruling yet on any of the data-center-constellation applications; a July petition for a programmatic environmental review sits with no decision deadline.
Readers of the study asked a fair question: if a disposal bond is "achievable within existing authority," why has the FCC never attached one to a license? In July the Commission answered, in a footnote to an unrelated grant: it asked the question in 2020 — whether a performance bond tied to successful post-mission disposal would serve the public interest — and "has not adopted such a requirement" SOURCED (FCC DA 26-706, fn. 31). In the same footnote it set aside a commenter's request that a new licensee be held financially accountable for debris remediation, as moot. Every bond the FCC does run points at the opposite failure: forfeited for building too slowly — a missed deployment milestone, even surrendering the license — never for leaving hardware in orbit at end of life. The machinery polices paper-hoarding, the mild harm; nothing secures the exit, the severe one. The question was asked six years ago and has not been answered; the one proceeding that did reach bonds has now concluded the other way — making the deployment bond optional, as a warehousing tool most systems no longer need — and the newest entrants had already petitioned to escape it. That is the continuity gap's regulatory face: the tool was on the shelf, pointed backwards; the shelf has now been cleared; and the exit is still unsecured.
And the largest filer finally filed a radiator. The study's §7.4 flagged the thermal numbers behind the biggest of these systems as the part no one could check: the filing said nothing about cooling, and the only figures available — 150 kW of compute behind a 110 m² radiator — came from a product reveal three months after the comment window closed. The 16 September response puts an envelope in the docket for the first time: solar arrays under 1,500 m², radiator under 200 m², mass under 4,000 kg SOURCED (SpaceX, ICFS PC0117233). It still does not state the power — the word does not appear in the response. Put the two together and the arithmetic is unforgiving in one direction only: at the density the International Space Station's radiators actually achieve, a 200 m² radiator sheds about 33 kilowatts. The reveal claims 150. Holding the reveal's figure, the satellite would have to shed heat at more than 750 watts per square metre — over four times flight heritage, and that is a floor, not an estimate, because the filed radiator is an upper bound and a smaller one only pushes the number up DERIVED (ours; ISS EATCS ≈166 W/m², panel-area basis, §7.4). It is a weaker figure than the ~8× the paper reports, and it does not replace it: 110 m² sits inside "under 200," so the filing is consistent with the reveal, at a bound. The other filed number is harder to place. An array at that 1,500 m² envelope, in full sun, would generate several hundred kilowatts — and every watt generated is a watt to be rejected. Whether the built array is anywhere near its envelope the docket does not say, and the filing's own tumbling-area table cannot be made to answer it: the areas in that table do not reconcile with the envelope in either direction. Nothing here says the design is impossible; hot-running hardware is a real engineering posture and an envelope is not a blueprint. It says what §7.4 said, now from the docket rather than from a press event: the physics that decides whether these satellites work is still not in the record the regulator is deciding on.
The record that does not decide
The first of those two records ended on a sentence that now needs amending. The physics that decides whether these satellites work, we said, is still not in the record the regulator is deciding on. That is true, and it is not the whole truth. The physics is in a record. Just not that one.
On 26 June 2026 — four and a half weeks before this study published — SpaceX completed an initial public offering. A company that sells shares to the public files with the Securities and Exchange Commission, and what it files there is written under a different discipline from a licence application: a prospectus is legally exposed in a way a docket letter is not, because investors who are misled have a remedy.
The prospectus states what a single satellite draws.
The docket is not silent about power in the aggregate, and it never has been. SpaceX's original application, filed in January 2026, offers the arithmetic of the whole programme: a million tonnes of satellites launched a year, "generating 100 kW of compute power per tonne", adding a hundred gigawatts of compute capacity annually SOURCED (SpaceX, ICFS SAT-LOA-20260108-00016, Legal Narrative, filed 30 Jan 2026). This study already drew that line, in the two places it belongs: §6 noted this very framing and what it is — capacity arithmetic the filer itself presents as aspirational, offered as a "for instance" — while §7.4's table recorded the other half, that the filing omits the per-satellite power entirely.
What the docket has never contained is the other number — what one satellite draws. That absence is not a technicality. On neither record's wording does the multiplication recover anything: the docket states its density as an illustration, and the prospectus states its own as a floor — "over" 100 kilowatts per tonne — and a maximum times a floor is bounded in neither direction. Which is why this study declines to compute one. The prospectus supplies the missing figure directly. It describes "early satellites generating 100 kilowatts of compute power and scaling from there" SOURCED (SpaceX, SEC Form 424B4, 12 Jun 2026) — a number per spacecraft, with the filer's own qualifiers attached, and the first of its kind in either record. The prospectus is equally frank about what is not settled — the "total system mass per satellite, and on-orbit assembly requirements" for the 100-gigawatt goal "continue to be refined as part of our ongoing engineering efforts" SOURCED (same). That sentence is worth holding onto, because it is the company confirming, in its own voice, what we could only infer from the shape of the FCC filing: the envelope filed with the Commission is not a design. It is a bound on one.
So the thermal question can now be asked with the company's own number. A 200 m² radiator sheds about 33 kilowatts at the density the International Space Station achieves. Put the prospectus's 100 kilowatts behind the docket's radiator and the satellite must shed heat at roughly 500 watts per square metre — about three times flight heritage DERIVED (ours; ISS EATCS ≈166 W/m², panel-area basis, §7.4).
Three numbers have now appeared in this analysis, and they fall: about eight times heritage in the paper, four and a half above, three here. That is not a series of retreats, and it would be a misreading to take it as one. Each is a floor, and each rests on a different input — the first on the radiator a product launch described, the second on that launch's power figure over the radiator the docket later filed, the third on the company's own stated power over that same filed radiator. What changes as the number falls is not our confidence but the grade of the source: the eight came from a press event, and the three comes from a document filed with a securities regulator. A smaller number we can stand behind is worth more than a larger one we cannot.
One caveat we will not paper over: the prospectus never uses the name the FCC filing uses, and it nowhere states that these early satellites are the ones whose envelope was filed in September. The link is strong — the same company, the same dawn-dusk sun-synchronous orbits, the same "up to one million satellites" requiring orbital debris mitigation approvals, and a sentence tying its existing platform to the programme's start date: "Our V3 satellite platform already incorporates proprietary chips" and "We expect to begin deploying our orbital AI compute satellites as early as 2028" SOURCED (same). Strong, but inferred. We say so rather than let the two records be silently welded together.
The same document tells investors what the study has been arguing about the commons. Among the risks SpaceX discloses is that the proliferation of constellations and the chance of collision "could limit or impair our launch flexibility and satellite deployment"; that as objects accumulate, "the probability of accidental collisions, fragmentation events, or other in-orbit incidents increases"; and that one consequence is "increased costs for collision avoidance maneuvers" SOURCED (same). Read that last phrase against part two of this note. The dodging this study counts in SpaceX's own filings — 207,152 manoeuvres in six months — appears in the securities record as a cost line that rises with congestion. The company also tells investors that "Not all satellite operators or other space actors adhere to the same rigorous" space-safety, debris-mitigation or coordination practices that it does — a sentence about everyone else, from the operator of roughly three-quarters of the active manoeuvrable satellites in orbit DERIVED (ours; 10,736 Starlink of 14,121 active manoeuvrable payloads = 76%, §2.1 census, epoch 8 Jul 2026 — a manoeuvrable base, not the 66% active-payload base §7.2 uses for fee incidence).
It is careful about its own record, and so are we. In its own words: "we have not experienced any failures of our autonomous collision avoidance system" that have resulted in the loss of a satellite SOURCED (same). That is a claim about its collision-avoidance system, not a claim that nothing has ever gone wrong, and it should not be stretched into one. It is also, precisely, §5's finding in the operator's own words: the record is clean because the system runs, every day, without failing.
And on the thing nobody has done: the prospectus says that the company has not, and "no one else has, previously operated or attempted to operate orbital AI compute" SOURCED (same).
One sentence in it belongs to §4 of the study. Describing its regulatory position, SpaceX tells investors that many of its FCC licences include "conditions regarding milestone schedules, reporting and surety‑bond requirements" SOURCED (same). That is the deploy-or-forfeit machinery §4 calls an accelerant, described to shareholders as a fact of doing business — by the same company that has asked the Commission to waive exactly those rules for its million-satellite system. Neither statement is improper, and both are true. They are simply addressed to different readers.
The scale, in the company's own words. "Our goal over time is to launch 100 gigawatts of compute to space each year" SOURCED (same) — which the prospectus notes would require the generation capacity to supply roughly a fifth of annual United States power production, and which it costs at approximately a million tonnes to orbit annually across thousands of launches. It also says a far smaller programme would still pay: a deployment rate of about 10 gigawatts a year, it tells investors, would still make a commercially attractive business. And the company that files this is not the one the study's §7 described at publication: its "acquisition of xAI in February 2026" SOURCED (same) means the largest applicant in this docket is now an artificial-intelligence company that also launches rockets.
What to make of two records. Nothing here accuses anyone of concealment. Different regulators ask different questions, and a company is entitled to answer each on its own terms; the FCC's letters asked about spectrum and debris, not about business plans, and the Commission got what it asked for.
But the study's §6.1 described two currencies — a fast, cheap filing layer running against a slow, hard-to-reverse physical one, with no institution built to arbitrate between them. Set the two records side by side and a sharper version of that appears. The regulator that can say no to a million satellites was told what a million tonnes of them would generate, and never what one of them draws. The regulator that cannot say no to any of them was told. The numbers that decide whether the physics works are a matter of public record — filed, searchable, and legally exposed — in the one place where nobody is deciding whether these satellites should fly.
The study's numbers remain as published, each pinned to its date. This note extends the record; it does not revise it.